Starkold were appointed the hoardings and logistics package on this scheme in Leeds for RG Group in early 2023, with a proposed completion date of 2025. For the Hoardings, we had to design and install a purpose built 11m sliding gate near the arches of the project to be able...
Category: Projects
Cheshire Oaks Designer Outlet
Starkold were appointed the logistics and hoarding contractor for Mace Group for this project which ran from January 2018 to June 2019, which as a whole had a combined package value to Starkold of £1.4m. The hoarding package involved erecting free-standing hoarding across much of the car-park at the same...
The Fairfax, Manchester
Starkold were appointed the hoardings and logistics package on this scheme in Manchesterfor RG Group in 2022, with a proposed completion date of 2025 after the project was put on hold for a while. The hoardings were installed to the 4 sides of the perimeter of the site, including working nightshifts after...