Starkold were appointed the hoardings and logistics package on this scheme in Manchesterfor RG Group in 2022, with a proposed completion date of 2025 after the project was put on hold for a while.
The hoardings were installed to the 4 sides of the perimeter of the site, including working nightshifts after liaising with the local councils to install along the tram line elevation.
Our Logistics team is being led by longstanding supervisor Bradley, with our regular Manchester based team underneath him including telehandler, hoist, traffic marshal’s, labourers and cleaners.